LOADING CCGT FOR INDUSTRIAL EXTRACTION STEAM TURBINES

  • Ivan Igorevich Komarov
  • Anna Alexandrovna Kocherova
  • Andrey Nikolaevich Rogalev
  • Arcady Efimovich Zaryankin
  • V. Zaryankin

Abstract

In this paper we are considering the issue of industrial bleed steam utilization to increase the capacity of combine cycle gas turbine plants. There is also investigated the feasibility of transition to steam turbine compressor drive.

References

[1] A. G. Kostjuk, V. V. Frolov, A. E. Bulkin, A. D. Truchnij, Parovyje i gasovyje turbiny dlja electrostantsyj, MPEI, Moscow, 2008.
[2] J. Kotowicz, S. Michalski, Influance of chosen working parameters of gas turbine unit used in air separation unit on efficiency of oxy-fuel supercritical power plant, Rynek Energii 106 (3) (2013) 74–80.
[3] A. E. Zarjankin, A. S. Mager, Novye componovochnye shemy parogasovych ustanovok i ich vlijanije na pokazateli PGU, Abstracts of the reports of the scientific school “Probljemy gasodinamiki i teplomassoobmena v energeticheskich technologijah” (2011).
[4] A. E. Zarjankin, V. A. Zarjankin, A. S. Mager, Parogasovyje ustanovki s vydelennym paroturbokompressornym blokom, Higher attestation commission journal [Nadjeghnost’ i bezopasnost’ v energetikje] 20 (1) (2013) .
Published
2013-12-03
How to Cite
KOMAROV, Ivan Igorevich et al. LOADING CCGT FOR INDUSTRIAL EXTRACTION STEAM TURBINES. Journal of Power Technologies, [S.l.], v. 93, n. 5, p. 303--307, dec. 2013. ISSN 2083-4195. Available at: <https://papers.itc.pw.edu.pl/index.php/JPT/article/view/498>. Date accessed: 21 dec. 2024.
Section
RDPE 2013 Conference

Most read articles by the same author(s)

Obs.: This plugin requires at least one statistics/report plugin to be enabled. If your statistics plugins provide more than one metric then please also select a main metric on the admin's site settings page and/or on the journal manager's settings pages.